We typically threshold the likelihood with four (possibly anomaly) or five (definitely anomaly) 9’s. We also have an additional step for computing the log likelihood, which converts 0.99999 to 0.5 and 0.9999 to 0.4. The log likelihood is suitable for plotting, while the straight likelihood is not (as you demonstrated). See here for converting the log likelihood: